Hakusan Station (I-13) is a station on the Toei Subway Mita Line (Mita Line). Published data from the Bureau of Transportation, Tokyo Metropolitan Government shows the ground-to-gate segment has an elevator, and the gate-to-platform segment has an elevator. This guide covers accessibility by segment at this station, how it compares with other stations on the same line, and what to check before you travel.

Hakusan Station (I-13): ground level ↔ ticket gates

An elevator is installed on this segment, so passengers who find stairs difficult can travel from ground level to the ticket gates.

An escalator is also installed (note: partial). Note that an escalator is not an alternative for wheelchair users.

Hakusan Station (I-13): ticket gates ↔ platform

An elevator is installed on this segment, so passengers can travel from the ticket gates to the platform without stairs.

An escalator is also installed.

Step-free from ground level to the platform by elevator

Hakusan Station (I-13) has both the ground-to-gate and gate-to-platform segments connected by elevator (or a same-floor layout that needs no lift equipment), so it appears possible to travel from ground level to the platform without stairs.

Whether a step-free route is secured is shown as "Secured." This indicates at least one route that avoids stairs entirely, and is a separate metric from individual elevator installations.

How does Mita Line compare with other stations on the line?

Of the 27 stations registered on Mita Line, 27 have the ground-to-platform route fully connected by elevator (or same floor) — about 100.0%. Hakusan Station (I-13) is one of the fully connected stations in that share.

About 96.3% of stations on Mita Line have a step-free route secured.

Accessible toilet and platform type

The accessible toilet at Hakusan Station (I-13) is confirmed as "Available." The platform type is "Side platforms" (original term: 相対式), and the station type code is "3." The station type code is an internal classification the Bureau of Transportation, Tokyo Metropolitan Government uses for station structure and scale; its detailed meaning should be checked against the original source.

If you need a restroom urgently or expect a long wait, use this information to plan your route in advance.

Check today's real-time availability separately

This information organizes the per-line accessibility data published by the Bureau of Transportation, Tokyo Metropolitan Government as facts, and does not include today's real-time outages, inspections, or construction. If elevator access is essential, check the official Bureau of Transportation guidance before you leave, and prioritize on-site staff guidance and signage once there.

Calling ahead (03-3815-3923) lets you confirm same-day equipment status or alternative routes. This article is based on the original source page (see below); if it differs from the original, follow the original source and on-site guidance.

Frequently Asked Questions

Can I get from ground level to the platform at Hakusan Station (I-13) by elevator?

Yes — based on published data from the Bureau of Transportation, Tokyo Metropolitan Government, both segments are connected by elevator (or a same-floor layout).

Does Hakusan Station (I-13) have an accessible toilet?

Yes, it is confirmed to have one.

What does a "secured step-free route" mean?

It means at least one route within the station avoids stairs entirely. This is a separate metric from individual elevator installations.

Is this information real-time?

No. It reflects published data as of 2026-09-17 and does not include today's real-time outages or inspections.

Are Tokyo Metro stations included?

No. This data covers only the Toei Subway (Asakusa, Mita, Shinjuku, and Oedo lines) operated by the Bureau of Transportation, Tokyo Metropolitan Government; Tokyo Metro, a separate company, is not included.

Sources and usage notes

Extracted facts only from accessibility information the Bureau of Transportation, Tokyo Metropolitan Government publishes per line. The wording here is written independently rather than translated from the source, and the data was collected on 2026-09-17. Check the official guidance and on-site signage to confirm actual availability.